Asphalt and blacktop are really the same thing, except that blacktop often refers to residential driveways and playgrounds; whereas asphalt is more commonly used for commercial purposes such as roads, and parking lots.
We Provide For All Types of Asphalt Installation, Repair, Or Removal
Better Paving will install a small driveway by hand, while large driveways, roads, and parking lots are installed w/ self-propelled paving machines. Each installation is completed to its own unique specifications that will normally exceed our client’s expectations.
New Construction Projects
In a completely new installation, the site is first inspected. Survey’s may also have to be looked over to insure exact property lines and even utility companies may have to be called to ensure a safe work site. Next the site is excavated and all grass, concrete, old asphalt are removed and carted off the site. The sub base is graded and power compacted.
Next, a stone blend is then installed to a depth of 4 to 6 inches and is allowed to settle. This can take anywhere from 1 to 60 days. After sufficient time, the site is finally paved with hot commercial asphalt at a depth of 2 to 3 inches, depending on the load requirements. It is recommended that the parking lot or driveway not be driven on for at least 3 days
Resurfacing:
In a completely new installation, the site is first inspected. Survey’s may also have to be looked over to insure exact property lines and even utility companies may have to be called to ensure a safe work site. Next the site is excavated and all grass, concrete, old asphalt are removed and carted off the site. The sub base is graded and power compacted.
Next, a stone blend is then installed to a depth of 4 to 6 inches and is allowed to settle. This can take anywhere from 1 to 60 days. After sufficient time, the site is finally paved with hot commercial asphalt at a depth of 2 to 3 inches, depending on the load requirements. It is recommended that the parking lot or driveway not be driven on for at least 3 days
Removal & Replacement
Asphalt removal and replacement may become necessary if an asphalt pavement has not had regular maintenance. Small cracks that inevitably form on the asphalt surface deepen over time, allowing water infiltration into the lower levels of asphalt. When water gets into these deep cracks, it can create holes in the substrate, structurally weakening the asphalt. These small surface cracks will also spread across the asphalt, then run deeper below those areas of the surface, so that large parts of the asphalt surface and their lower levels become affected. When this happens, superficial repairs are not sufficient to fix the structural damage. The asphalt must be removed and replaced.